Google AI
The Times Australia

Times Media

Doubleview Reports Maiden Mineral Resource Estimate with 150 Million Tonnes Indicated (0.408% CuEq) and 477 Million Tonnes Inferred (0.344% CuEq) Resource

Resource estimate highlights:
    • Indicated resource estimate of 150 million tonnes (Mt) and inferred resource estimate of 477 Mt at 0.2% copper equivalent ("CuEq") cut-off grade; or
    • Indicated resource estimate of 1.353 billion pounds (Blb) of CuEq at 0.408% CuEq, which includes 733 Mlb of copper, 28 Mlb of cobalt, 929 thousand ounces of gold and 2 million ounces of silver.

    • Inferred resource estimate of 3.619 Blb of CuEq at 0.344% CuEq, which includes 1.945 Blb of copper, 91 Mlb of cobalt, 2.328 million ounces of gold and 7.575 million ounces of silver.
    • Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

      Vancouver, British Columbia - Newsfile Corp. - July 25, 2024 - Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) ("Doubleview" or the "Company") is pleased to announce the maiden Mineral Resource Estimate ("MRE") of its 100% owned polymetallic Hat porphyry project ("Hat"), located in northwestern British Columbia. With major content of Copper, Gold, Cobalt as well as the potential of Scandium, Hat can become an important source of critical minerals.

      Farshad Shirvani, president & CEO of Doubleview Gold Corp commented, "Year by year, the size of the deposit was increased by very targeted drilling, bringing it to a footprint of about 1.5km x 1.38km. I appreciate my technical and management team in this endeavor. We've discovered numerous additional elements within the Hat deposit that will soon be unveiled, each further showcasing the deposit's uniqueness and enhancing the resource."

      Summary of MRE for Hat Deposit:

      Table 1: Hat Deposit MRE with a 0.2% CuEq cut-off (being the basecase scenario to be set forth in the Technical Report)


      Open Pit
      Model Hat


      Resource Category

      Tonnage
      Average Grade
      Metal Content
      CuEq
      Cu
      Co
      Au
      Ag
      CuEq
      Cu
      Co
      Au
      Ag
      Mt
      %
      %
      %
      g/t
      g/t
      million lb
      million lb
      million lb
      thousand oz
      thousand oz
      In Pit
      Indicated
      150
      0.408
      0.221
      0.008
      0.19
      0.42
      1,353
      733
      28
      929
      2,045
      Inferred
      477
      0.344
      0.185
      0.009
      0.15
      0.49
      3,619
      1,945
      91
      2,328
      7,575

      Parameters used to calculate cut-off grade:

      Au price US$/oz: 1,900; Ag price US$/oz: 24; Cu price US$/lb: 4; Co price US$/lb: 22; Au recovery: 89.0%; Ag recovery: 68.0%; Cu recovery: 84.0%; Co recovery: 78.0%; Mining cost US$/t (OP): 2.5; Processing Cost US$/t: 6; G&A Cost US$/t: 2

      Copper Equivalent Calculation

      CuEq in % = ([Ag grade_ppm] *24*0.68/31.1035 + [Au grade_ppm] *1900*.89/31.1035 + 0.0001* [Co grade_ppm] *22*0.78*22.0462 + 0.0001* [Cu grade_ppm] *4*0.84*22.0462)/(4*22.0462*0.84). Scandium is not part of the copper equivalent calculation.

      MRE Table Notes:
      1. The effective date of the (MRE) is 17 July 2024.
      2. The Mineral Resource Estimate has been stated using CuEq cut-off grade for comparison purposes with Doubleview's previous statements. The CuEq value is primarily driven by the prices of associated minerals. Micon International Limited's ("Micon") QPs recommend that future resource estimates are completed using a NSR calculation.
      3. Mr. William Lewis P.Geo., and Ms. Chitrali Sarkar M.Sc., P.Geo., of Micon are the QPs responsible for MRE as defined in Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and are responsible for the 2024 MRE.
      4. The mineral resources disclosed in this news release were estimated using the CIM standards for mineral resource and reserve definitions and the CIM best practices guidelines for resource estimation.
      5. The mineral resources reported are within the boundaries of a pitshell derived from the open pit optimizer, assuming surface mining methods with an overall slope angle of 45 degrees and the original block model was re-blocked to 20m x 20m x 20m. Mineralized blocks outside of the pitshell are not considered to be part of the MRE.
      6. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
      7. Geological modelling and the MRE have been completed using Leapfrog Geo and Edge software.
      8. An open pit cut-off grade of 0.14% CuEq was calculated for the MRE using a gold price of US$1,900/oz, a silver price of US$24/oz, a copper price of US$4/lb and a cobalt price of US$22/lb; mining cost US$2.5/t, processing cost US$6/t and G&A costs of US$2/t; gold recovery of 89%, silver recovery of 68%, copper recovery of 84% and cobalt recovery of 78%. However, to further fulfill the criteria for an MRE to meet the definition of potentially economic extraction, Doubleview has used an open pit cut-off grade of 0.20% CuEq to report the initial basecase mineral resources.
      9. EUR ING Andrew Carter B.Sc. CEng. MIMMM, MSAIMM SME of Coffey, Tetra Tech has reviewed the metallurgical test work and is the QP responsible for the metallurgical recoveries and processing costs.
      10. The MRE has been classified according to CIM definitions of Indicated and Inferred Resources. There are no Measured Resources, at this time. The Mineral Resource classification has been visually reviewed to eliminate any 'Spotted Dog' effect, commonly seen in computer-generated models.
      11. Ordinary Kriging (OK) interpolation method was used with a single block size of 10m x 10m x 10m.
      12. The mineral resource results are presented in-situ within the optimized pit. Mineralized material outside the pit has not been considered as a part of the current MRE. Calculations used metric units (metres, tonnes, g/t).
      13. The tonnes and metal contents are rounded to reflect that the numbers are an estimate and any discrepancies in the totals are due to the rounding effects.
      14. MRE is concluded using up to drillhole H071 at the Hat deposit.


      Sensitivity Analysis:

      Table 2: Sensitivity Analysis on Grade inside the Hat Deposit Pit

      OP model
      Category
      CuEq
      cut-off grade

      Cumulative Tonnage
      Weighted Average Value
      Cumulative Material Content
      CuEq
      Cu
      Co
      Au
      Ag
      CuEq
      Cu
      Co
      Au
      Ag
      %
      Million Tonnes
      %
      %
      %
      g/t
      g/t
      million lb
      million lb
      million lb
      thousand oz
      thousand oz
      In Pit
      Indicated
      0.1
      217.17
      0.33
      0.172
      0.008
      0.16
      0.37
      1576
      824
      38
      1086
      2591
      0.12
      205.60
      0.34
      0.180
      0.008
      0.16
      0.38
      1547
      814
      36
      1067
      2515
      0.14
      192.39
      0.36
      0.188
      0.008
      0.17
      0.39
      1509
      799
      34
      1040
      2417
      0.16
      178.31
      0.37
      0.198
      0.008
      0.18
      0.40
      1463
      780
      32
      1008
      2300
      0.18
      164.32
      0.39
      0.209
      0.008
      0.18
      0.41
      1410
      758
      30
      971
      2179
      0.2
      150.49
      0.41
      0.221
      0.008
      0.19
      0.42
      1353
      733
      28
      929
      2045
      0.3
      92.83
      0.51
      0.285
      0.009
      0.24
      0.48
      1039
      584
      18
      707
      1421
      0.4
      55.91
      0.61
      0.354
      0.009
      0.28
      0.53
      758
      437
      12
      510
      960
      0.5
      34.27
      0.72
      0.425
      0.010
      0.33
      0.59
      545
      321
      8
      361
      651
      0.6
      21.16
      0.83
      0.498
      0.011
      0.37
      0.65
      387
      232
      5
      253
      441
      0.8
      8.14
      1.06
      0.659
      0.012
      0.46
      0.79
      191
      118
      2
      119
      208
      Inferred
      0.1
      903.19
      0.25
      0.129
      0.008
      0.11
      0.42
      5008
      2559
      153
      3194
      12312
      0.12
      812.65
      0.27
      0.138
      0.008
      0.12
      0.44
      4789
      2471
      141
      3060
      11493
      0.14
      722.77
      0.28
      0.148
      0.008
      0.12
      0.45
      4531
      2364
      129
      2899
      10571
      0.16
      634.85
      0.30
      0.160
      0.008
      0.13
      0.47
      4240
      2236
      116
      2716
      9570
      0.18
      550.39
      0.32
      0.172
      0.008
      0.14
      0.48
      3924
      2091
      103
      2517
      8536
      0.2
      477.38
      0.34
      0.185
      0.009
      0.15
      0.49
      3619
      1945
      91
      2328
      7575
      0.3
      223.56
      0.46
      0.254
      0.010
      0.21
      0.52
      2252
      1251
      47
      1477
      3762
      0.4
      111.17
      0.57
      0.323
      0.010
      0.26
      0.52
      1403
      792
      25
      940
      1872
      0.5
      59.97
      0.68
      0.389
      0.011
      0.32
      0.52
      902
      514
      15
      612
      1011
      0.6
      33.98
      0.79
      0.452
      0.012
      0.37
      0.53
      590
      339
      9
      404
      582
      0.8
      11.16
      1.01
      0.584
      0.013
      0.48
      0.56
      247
      144
      3
      172
      202

      Notes:

      1) The parameters used for the resource estimate determined that the cut-off grade for the Hat deposit was 0.14% CuEq for the MRE. However, to further fulfill the criteria for an MRE to meet the definition of potentially economic extraction, Doubleview has used an open pit highlighted cut-off grade of 0.20% CuEq to report the initial basecase mineral resources.
      2) The reported quantities and grade estimates at different cut-off grades are presented for the sole purpose of demonstrating the sensitivity of the mineral resource model to varying CuEq cut-off grades. Micon's QP has reviewed the varying CuEq cut-off grades used in the sensitivity analysis, and it is the opinion of the QP that they meet the test for reasonable prospects of eventual economic extraction given the potential variability of the parameters used to determine the cut-off grades.

      Scandium Potential for Hat Project

      Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3. The scandium potential is confined solely to the resource blocks that meet a cut-off grade of 0.2% CuEq within the open pit shell that defines the extent of the MRE. Any mineralized blocks outside the pitshell were not considered to be part of the scandium potential.

      ** Scandium Potential:

      1. The scandium potential is confined to the resource blocks that meet a cut-off grade of 0.2% CuEq within the open pit shell that defines the extent of the MRE.

      2. Preliminary Metallurgical test work focused on producing a high-gold, low-cobalt copper concentrate and a low-gold, high-cobalt pyrite concentrate. Scandium is primarily associated with pyroxene and amphibole gangue minerals and reports to flotation tails. Tests have demonstrated that scandium can be extracted from tailings using sulphuric acid at elevated temperature as a lixiviant. Test work has also shown that scandium can be separated into an intermediate scandium - aluminium product that can be processed further for the recovery of a scandium oxide product. Separation of scandium and aluminum is the focus of the next phase of test work. The concept being developed is that the pyrite concentrate can be developed as a source of acid for both cobalt and scandium recovery.

        Caption


        Figure 1: Open Pit Plan and Block Model

        To view an enhanced version of this graphic, please visit:
        https://images.newsfilecorp.com/files/8003/217674_01b4af5e5469d851_001full.jpg

        Caption


        Figure 2: Open Pit Section and Block Model

        To view an enhanced version of this graphic, please visit:
        https://images.newsfilecorp.com/files/8003/217674_01b4af5e5469d851_002full.jpg

        The Hat Deposit

        The Hat Claims property consists of ten mineral tenures covering 5,200 hectares located north of the Golden Bear mine road in northwest BC. For additional information please visit www.doubleview.ca.

        The MRE was prepared by Micon in accordance with CIM Definition Standards on Mineral Resources and Reserves. A Technical Report in support of the MRE will be filed on SEDAR+ (www.sedarplus.ca) within 45 days.

        William J. Lewis P.Geo., and Chitrali Sarkar M.Sc., P.Geo., of Micon are the QPs for the MRE and have reviewed and approved the technical disclosure relating to the MRE contained in this news release. Both Mr. Lewis and Ms. Sarkar are independent of Doubleview.

        EUR ING Andrew Carter B.Sc. CEng. MIMMM QMR, MSAIMM SME of Tetra Tech, Geo-Environment & Mining Services is Doubleview's Qualified Person with respect to the HAT Project Metallurgical Studies as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects and has reviewed and approved the technical contents of this news release. He is independent of Doubleview.

        About Doubleview Gold Corp

        Doubleview Gold Corp, a mineral resource exploration and development company, is based in Vancouver, British Columbia, Canada, and is publicly traded on the TSX-Venture Exchange (TSXV: DBG) (OTCQB: DBLVF) (FSE: A1W038) (FSE: 1D4). Doubleview identifies, acquires and finances precious and base metal exploration projects in North America, particularly in British Columbia. Doubleview increases shareholder value through acquisition and exploration of quality gold, copper, cobalt, scandium and silver, collectively critical minerals, properties and the application of advanced state-of-the-art exploration methods. The Company's portfolio of strategic properties provides diversification and mitigates investment risks.

        On behalf of the Board of Directors,

        Farshad Shirvani, President & Chief Executive Officer

        For further information please contact:

        Doubleview Gold Corp
        Vancouver, BC Farshad Shirvani
        President & CEO

        Institutional Line: (604) 607-5470

        T: (604) 678-9587
        E: corporate@doubleview.ca

        NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

        Certain of the statements made and information contained herein may constitute "forward-looking information." In particular references to the Mineral Resource Estimate and future work programs or expectations on the quality or results of such work programs are subject to risks associated with operations on the property, exploration activity generally, equipment limitations and availability, as well as other risks that we may not be currently aware of. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.

        The issuer is solely responsible for the content of this announcement.

        Read more: Doubleview Reports Maiden Mineral Resource Estimate with 150 Million Tonnes Indicated (0.408% CuEq)...

More Articles …

  1. Southco Introduces A Flush-Mount E6-73 Constant Torque Hinge
  2. Correcting and Replacing: Funeral Director of Confidence Funeral Featured on Association of Trade & Commerce for SME 500 Award
  3. Avenue K Hosts ‘Sport My Art’ to Empower Artists with Disabilities
  4. smart Aims to Make Premium EVs Ubiquitous in Singapore
  5. AS Watson Accelerates Supply Chain Sustainability Efforts to Fight Climate Change
  6. Franklin Templeton and SBI Holdings Sign MoU to Establish Joint Venture in Japan
  7. KBTG Welcomes a Blast From the Future at the Second Annual KBTG Techtopia
  8. Exploiting the Unique Advantages of the Greater Bay Area’s "One Country, Two Systems, Three Legal Jurisdictions" to Propel Talent Integration Launch of the Greater Bay Area (GBA) Online Collaborative Platform
  9. 2024 FIABCI-Taiwan Real Estate Excellence Awards Ceremony Focus on Promoting ESG Principles and Sustainable Developments in Taiwan
  10. AGW-MS Capital: Launching Fixed Income ETF Products to Lead the Investment Trend
  11. CORRECTION FROM SOURCE: Doubleview Reports Maiden Mineral Resource Estimate
  12. The Arc in London’s Fintech District Celebrates Strong Asian Connections as It Opens Its Doors
  13. Save the Children Hong Kong celebrating its 15th Anniversary Inaugural Children’s Champion Award 2024 Recognises 13 Awardees for the Positive Impact on Children’s Lives
  14. De Beers Group Reports on Progress Towards ‘Building Forever’ Sustainability Goals
  15. BingX Sponsors CoinGecko Q2 2024 Market Report: Including BTC ETH SOL
  16. Agridence Develops Platform for GPSNR’s Reporting Requirements (RR)
  17. OG of Prawn Claypot, Woodlands Claypot Prawn Brings the Heat to Jurong: Grand Opening of 4th Outlet on July 29, 2024
  18. AOC B Series Monitors Upgraded with 120Hz and More for an Immersive Home Entertainment Experience
  19. Capgemini: Organizations report a four-fold increase in the deployment of generative AI since 2023
  20. SonicWall Report Details Exponential Increase in Overall Cyberattacks; Reveals Potential Revenue Risk for Businesses
  21. Alcatel-Lucent Enterprise partners with PT. Nusatrindo Sejati to offer Digital Age Communications in Indonesia
  22. Select Catering Introduces New Teochew Porridge Buffet, Launching August 2024
  23. Redefining Family Day Events with Fun and Exciting Carnival Experiences through Professional Event Planning
  24. FitLine becomes Official Partner of the ATP Tour
  25. RGE Named ‘Champion of Good’ by National Volunteer and Philanthropy Centre for Leading ESG Initiatives
  26. Seafood Expo Asia’s 2024 Conference Program
  27. Schneider Electric named the world’s most sustainable company by Time magazine and Statista
  28. PPD Global earns the Best Place to Work certification in Romania for 2024
  29. VinFast capitalizes on Europe's SUV craze with diverse lineup
  30. Konecta Romania recognized as One of the Best Places to Work for 2024
  31. Blue Sets Sail to Partner with over 100 Insurance Brokers in 2 Years First Launch of 25-year Participating Life Insurance Plan WeWealth GoWealth Generator
  32. FTLife Officially Renamed CTF Life
  33. No Rituals, Just Skills: Octa's Survey Revealed Traders' Attitude to Luck
  34. Schneider Electric’s Category-Defining EcoStruxure™ Resource Advisor Raises the Bar with a New Suite of Solutions
  35. Luxshare Precision Announces 2023 Annual Results
  36. CashOn Launches Hong Kong’s First Digital Currency Lending Platform, Valued at US$10 Million, Matching Borrowers with Financial Institutions for Fiat Currency Financing
  37. Appier expands BotBonnie's capabilities with Vietnamese UI support and Zalo integration
  38. ASUS Announces All-New Server-Grade Hardware Powered by AMD EPYC 4004
  39. Octa's guide to financial literacy and cyber health: essential tips for traders
  40. Office of the Prime Minister, in collaboration with the Royal Bangkok Symphony Orchestra, will be organizing a world-class opera performance, "Madama Butterfly," on the auspicious occasion of His Majesty the King's 6th cycle birthday anniversary on 28 Jul
  41. Flat Ads Showcases at 2024 ChinaJoy, Partnering with Developers Worldwide to Explore Global Growth
  42. Prudence Foundation and Warner Bros. Discovery Asia Pacific team up to decode complex issues on climate and health
  43. Cathay’s ‘1 Ticket, 1 Tree’ returns for fourth year, expands to include cargo contributions
  44. Swee Heng Unveils New Bread and Pastry Brand: Toast & Roll
  45. First Page Releases Guide to Reveal Three Main Reasons Behind 2024 Google Ranking Drops and Highlight AI's Impact on SEO
  46. Terence Lau & Associates: Unlocking Potential in Future Financial Advisors
  47. Pacific Century Premium Developments Limited announces interim results for six months ended June 30, 2024
  48. Restoring Nature: Baiyangdian's Journey to Becoming a Bird Paradise
  49. Samsung Singapore Opens Three New Samsung Experience Stores
  50. Appier announces partnership with SkinX Thailand to drive AI-powered digital transformation in dermatology and telemedicine

Times Magazine

SpaceX changed spaceflight. Now China is proving reusable rockets are the new battleground.

When SpaceX first landed a Falcon 9 booster vertically on a floating drone ship, many experts desc...

Hybrid, Plug-in Hybrid or Electric? Understanding the Differences

Buying a new car has become more complicated than choosing between petrol and diesel. Today's buye...

What Is Fatphobia? Understanding the Debate

The word "fatphobia" has become increasingly common in discussions about health, body image and so...

Technology

SpaceX changed spaceflight. Now Chi…

When SpaceX first landed a Falcon 9 booster vertically on a floating drone ship, many experts desc...

Local News

Fremantle Ports to trial project to…

Fremantle Ports has partnered with Byssal and DevelopmentWA to trial an innovative nature-based pilo...

Culture

Cyclosporiasis outbreak in the United States:…

Thousands of cases of cyclosporiasis have been reported across the United States in what health au...

Travel

Why Vietnam's Ancient Cave Region Is Bec…

For years, Phong Nha in central Vietnam has attracted adventurous travellers drawn by its spectacu...

The Times Features

Could It Be Cheaper to Start Again? The Real Cost of Fu…

Moving house has long been associated with removal trucks, heavy lifting and the challenge of fitt...

Cyclosporiasis outbreak in the United States: Should Au…

Thousands of cases of cyclosporiasis have been reported across the United States in what health au...

Public Tenders: The Business Opportunity Many Australia…

Winning new customers is one of the biggest challenges facing any business. While many companies c...